Home › Guides › Construction Cost per Sq Ft in Union Town Lahore and Nearby Raiwind Road Societies (2026)

Construction Cost per Sq Ft in Union Town Lahore and Nearby Raiwind Road Societies (2026)

Updated 28 October 2026 | Reading time: 8 minutes

Quick answer: In 2026, construction in Union Town and the nearby Raiwind Road societies costs about Rs 2,800 to Rs 3,800 per sq ft for grey structure and Rs 2,500 to Rs 5,500 per sq ft for finishing, so a full turnkey house runs roughly Rs 5,300 to Rs 9,300 per sq ft. Rates barely change from one society to the next on this corridor. Your design, materials and covered area move the price far more than the address.

People searching for a construction rate in Union Town often also compare Etihad Town, Wapda Town, Lake City or Fazaia. This guide gives one honest set of per sq ft numbers for the whole Raiwind Road area, explains what really changes the price between societies, and shows plot-wise totals so you can budget in minutes.

Where Union Town Sits on the Raiwind Road Corridor

Union Town is an LDA-approved community by Union Developers, reached from Abdul Sattar Edhi Road and Pine Avenue. Listings and project pages place it close to Shaukat Khanum Hospital, UCP, the Lahore Ring Road, Canal Bank Road, Thokar Niaz Baig and Allama Iqbal International Airport, and several listings describe it as near Etihad Town.

Raiwind Road itself is about 27 km long and starts on Canal Bank Road after Thokar Niaz Baig. Along it you pass Ali Town (with an Orange Line metro station), Qazalbash Chowk where a left turn leads onto Abdul Sattar Edhi Road, then Wapda Town and Iqbal Avenue, LDA Avenue One Chowk, Fazaia Interchange for the Ring Road, and further on the entrances to Lake City and Al Kabir Town.

Union Town and nearby societies along Raiwind Road Lahore, from Thokar Niaz Baig to Adda Plot Chowk

2026 Construction Rates per Sq Ft for Union Town and Nearby Areas

Work type Rate per sq ft (2026, Lahore) What it covers
Grey structure Rs 2,800 to Rs 3,800 Foundation to roof slab, brickwork, plaster, rough electrical and plumbing
Finishing Rs 2,500 to Rs 5,500 Tiles, kitchen, woodwork, paint, fittings, sanitary ware
Turnkey (grey + finishing) About Rs 5,300 to Rs 9,300 Move-in-ready house, depending on specification
Labour share 30 to 40 percent of total Higher on complex designs

The ranges come from 2026 Lahore cost guides; the turnkey row simply adds the grey and finishing ranges. Cement in the Lahore and northern zone was reported near Rs 1,630 per 50 kg bag in October 2026, up from Rs 1,350 in July figures used by one guide, so quotes drawn up months ago may now be low.

Does the Rate Change Between Union Town, Etihad Town, Wapda Town and Lake City?

For the same design and the same materials, the per sq ft cost is very close across these societies, because bricks, steel, cement and labour are bought in the same Lahore market. What does differ from society to society is the paperwork and site conditions, not the base rate:

Area Where it sits What to check before you build
Union Town Abdul Sattar Edhi Road, access from Pine Avenue Approved map, block and plot number, utilities at your plot
Etihad Town Close to Union Town on the same road, per listings Society building rules and plan approval route
Wapda Town and Iqbal Avenue Near Qazalbash Chowk on Raiwind Road Authority approval and local by-laws for your phase
LDA Avenue About 5 km past Qazalbash Chowk LDA map approval and covered-area limits
Lake City and Al Kabir Town After Adda Plot Chowk, near the Ring Road Society rules, access for trucks, distance for material delivery
Fazaia Housing Scheme Via Fazaia Interchange on the Ring Road Scheme-specific rules and approvals

Rules such as setbacks, permitted covered area and plan fees are set by each society or authority and change over time, so confirm them with the society office before you finalise drawings. For Union Town, read our LDA map approval guide.

Total Cost by Plot Size in Union Town (Grey Structure)

These totals use a 2026 grey-structure calculator for a standard A-grade double-storey house with no basement. Covered area includes ground floor, first floor and mumty.

Plot size Typical covered area Rate used Grey structure total
5 Marla 1,800 to 2,100 sq ft Rs 3,200 per sq ft Rs 57.6 to 67.2 lakh
10 Marla 3,000 to 3,400 sq ft Rs 3,270 per sq ft Rs 98 lakh to 1.11 crore
1 Kanal 5,500 to 6,300 sq ft Rs 3,300 per sq ft Rs 1.82 to 2.08 crore
2 Kanal 10,000 to 11,500 sq ft Rs 3,430 per sq ft Rs 3.43 to 3.95 crore

Union Town listings mainly show plots up to 1 Kanal, so the 2 Kanal row is useful mostly if you are also planning a larger house elsewhere in Lahore. For detailed budgets see our guides for 3 Marla, 5 Marla and the 10 Marla house.

Fresh brickwork with cement mortar on a house under construction in Pakistan (illustrative image)
Illustrative image: brickwork at grey structure stage.

Why the Same Plot Gets Very Different Per Sq Ft Quotes

  • Covered area is not plot area. A rate per sq ft applies to covered area. Always ask which number the quote multiplies.
  • Specification gap. Grade-60 steel, branded cement and first-class bricks cost more than economy options, and the difference is hidden in a lump sum.
  • Scope gap. One builder includes rough electrical and plumbing, another does not.
  • Basement and elevation. Both are usually extra lines.
  • Price date. Material rates can move several percent a month, so an old quote is not a current price.

How to Get a Reliable Per Sq Ft Price

  1. Finish your drawings first and fix the covered area.
  2. Ask two or three contractors to price the same drawings with an itemised BOQ.
  3. Compare steel grade and brand, cement brand, brick type and exclusions line by line.
  4. Check who handles map approval and whether it is in the price.
  5. Tie payments to finished stages and ask for the warranty in writing.

Our construction cost calculator gives a first estimate in a minute, and our guide to the top construction companies in Union Town Lahore shows how to judge the quotes you receive.

Finished modern two-storey house on a corner plot in a Lahore society (illustrative image)
Illustrative image: a finished two-storey home on a corner plot.

Get a Firm Price for Your Plot

Per sq ft ranges are only a starting point. Share your plot size, block and drawings, and ask for an itemised BOQ that names every material by brand and grade, lists exclusions and links payments to finished stages. Our guide to the top construction companies in Union Town Lahore explains how to judge the quotes you receive.

Prefer to start here? Request an estimate, tap the WhatsApp button on this page, or explore our areas we serve.

Frequently Asked Questions

What is the construction cost per sq ft in Union Town Lahore?

In 2026, grey structure costs about Rs 2,800 to Rs 3,800 per sq ft and finishing about Rs 2,500 to Rs 5,500 per sq ft, so a turnkey house runs roughly Rs 5,300 to Rs 9,300 per sq ft depending on specification.

Is construction cheaper in Union Town than in Wapda Town or Lake City?

Not by much. Materials and labour are bought in the same Lahore market, so the base rate is very similar. Differences come from design, specification, approval fees and site access rather than the society name.

How much does a 1 Kanal house cost in Union Town?

A standard double-storey 1 Kanal house with 5,500 to 6,300 sq ft of covered area comes to about Rs 1.82 to Rs 2.08 crore for grey structure in 2026, excluding a basement and finishing.

Does the per sq ft rate include the boundary wall and finishing?

Not usually. A grey structure rate covers the structure only. Finishing, boundary wall, furniture and landscaping are separate, so ask for a full scope list.

Why has the construction rate gone up in 2026?

Material prices are a major driver. Cement in the Lahore and northern zone was reported near Rs 1,630 per 50 kg bag in October 2026, and material rates can move several percent a month.

Which area on Raiwind Road is best for building a house?

That depends on your plot, budget, society rules and access. Compare approval requirements and utilities at the actual plot rather than relying on the area name.

Final Verdict

Use Rs 2,800 to Rs 3,800 per sq ft as the grey structure range for Union Town and the nearby Raiwind Road societies, add finishing on top, and expect the address to matter far less than your drawings and material choices. Get itemised BOQs against the same plan, confirm society approvals, and compare line by line. When you are ready, request an itemised estimate or see our construction services in Union Town.

Construction Company Union Town Team

Construction professionals building grey structure and turnkey homes across Union Town Lahore, on fixed-price BOQ contracts. Every guide is written from live project experience, not theory.

About Construction Company Union Town
Keep Reading

Related Construction Guides

Ready to Build in Union Town Lahore?

Itemised BOQ within 48 hours, every material by brand and grade.